The Lardy technical centre is located in Essonne, about 50 km south of Paris. Spanning the municipalities of Lardy and Bouray-sur-Juine, the Lardy technical centre is nestled in natural surroundings and protects some 100 hectares of forest on the site.
The sealed area now covers 37 ha, of which 9 ha are buildings. This is unlikely to change much once the Powertrain Engineering Centre has been completed in 2009-2010.
The built area, which was previously concentrated on the south-east of the site now extends northwards. The section occupied by production buildings therefore borders a residential and communal area. The section occupied by production buildings therefore borders a residential area, with educational and retirement facilities less than 1 km away. The forested section borders a different residential area.
The last particular features include the railway line between Paris and south-western France that crosses the site, and the Mesnil-Voisin chateau, listed as a historic building, which is in the vicinity.
The year as a whole saw a clear drop in activity owing to the economic environment. The CTL was subject to the crisis-period labor deal, with the site closing for 19 business days.
These events contributed to a downturn in all our environmental indicators.
Budget reductions prevented the CTL from rolling out all its 2009 projects. However:
The site implemented a program to replace aging scrubber-hydrocarbon separators. This contributed to a clear improvement in the quality of our liquid effluent parameters compared with 2008.
- SS: -76%
- OM: -75%
- Toxic metals: -68%
|
Water consumption (thousands of m3) |
180.7 |
-28% |
-73% |
|
Liquid discharge |
|
|
|
|
Suspended solids (kg/d) |
31.0 |
-76% |
8% |
|
OM (kg/d) |
38.4 |
-75% |
-18% |
|
Toxic metals (kg/d) |
0.1 |
-68% |
-90% |
|
Atmospheric emissions |
|
|
|
|
Direct and indirect greenhouse gas emissions (t CO2 equivalent) |
16,623 |
* |
* |
|
NOx emissions (t) |
6.3 |
-14% |
-13% |
|
SO2 emissions (t) |
0.2 |
-28% |
138% |
|
Hazardous waste (t) |
483 |
-39% |
* |
|
Energy (MWh LHV) |
96,656 |
-10% |
1% |
(*): change in scope
For further details, see registration documents: