1.Cergy-Pontoise - RSAS
 The decrease since 2004 was due to the roll-out of an action plan to cut consumption....
 
2.Maubeuge (MCA)
 The plant has reduced its emissions of volatile organic compounds (VOCs) by more than 40 % per vehicle since 1997. The plant has introduced action plans across the entire vehicle painting process : air treatment and incineration of booth air, increased application efficiency by the robots, improvement of used solvent recovery, colour batches....
 
3.Séville (Spain)
 In 2007 an action plan was put in place to improve the quality of emissions to water. Results show an improvement in discharge parameters, with the exception of ammonium nitrate and total organic carbon.... In 2006 the plant assessed its major risks for the first time. Based on this diagnosis, covering chemicals legionella and waste, an action plan was put in place to address all anomalies....
 
4.Action plan
 Action planAction planAction plan. Our main pages on this subject :. A new physical-chemical industrial effluent treatment plant will be started up at Somaca in 2008. Another significant example is the global waste management system, compliant with European standards, set up in 2007. And action plans on the manufacturing system brought energy savings per car of 15 % in 2006 and 22 % in 2007.......
 
5.Continuous improvement
 Efforts to cut the frequency and severity of occupational accidents continued in 2008. An action plan was put in place to pursue continuous improvements in safety and working conditions.......
 
6.Occupational accidents
 Occupational accidents... The number of lost-time occupational accidents increased slightly on 2006 at the Rueil-Lardy site (15 compared with 21). There has been a significant reduction in the number of accidents relative to the number of hours worked.... Efforts to cut the frequency and severity of occupational accidents continued in 2008. An action plan was put in place to pursue continuous improvements in safety and working conditions.......
 
7.Safety and working conditions
 In 2007, the number of lost-time days remained stable (388 at Rueil-Lardy compared with 359 in 2006), reflecting the initiatives taken in 2007 to improve safety and working conditions.... Efforts to cut the frequency and severity of occupational accidents continued in 2008. An action plan was put in place to pursue continuous improvements in safety and working conditions.......
 
8.Vocs
 The plant has reduced its emissions of volatile organic compounds (VOCs) by more than 40 % per vehicle since 1997. The plant has introduced action plans across the entire vehicle painting process : air treatment and incineration of booth air, increased application efficiency by the robots, improvement of used solvent recovery, colour batches.......
 
9.Volatile organic compounds
 The plant has reduced its emissions of volatile organic compounds (VOCs) by more than 40 % per vehicle since 1997. The plant has introduced action plans across the entire vehicle painting process : air treatment and incineration of booth air, increased application efficiency by the robots, improvement of used solvent recovery, colour batches.......
 
10.Waste management
 A new physical-chemical industrial effluent treatment plant will be started up at Somaca in 2008. Another significant example is the global waste management system, compliant with European standards, set up in 2007. And action plans on the manufacturing system brought energy savings per car of 15 % in 2006 and 22 % in 2007.......