1.Improve waste management
 The main priority of the progress plan is to cut quantities of residual waste incinerated without recovery of energy or sent to landfill. In pursuit of this aim, Renault is taking action at source (reduction in quantities of waste, design, sorting). The amount of packaging waste per vehicle fell 54 % between 1996 and 2007. In 2007 sites produced 46 kg of ordinary waste (excluding sheet metal scrap) per vehicle. In 2007 sites produced 29 kg of hazardous waste per vehicle....
 
2.Santa Isabel
 In 2007, the increase in hazardous waste was also due to an increase in the plant's overall activity (a 28 % rise in the number of vehicles produced) compared with 2006....
 
3.Tandil
 Also in 2007, an 80m2 secure depot was built to store hazardous industrial waste....
 
4.Vilvoorde - RIB
 Ordinary Industrial Waste (OIW) and Hazardous Industrial Waste (HIW) tonnage dropped 59 % and 92 % respectively between 2001 and 2007. The plant recovers 100 % of its waste....
 
5.Renault do Brazil Ayrton Senna Complex
 Ordinary industrial waste (OIW) and hazardous industrial waste (HIW) tonnage rose....
 
6.Douai
 Tonnages of Ordinary Industrial Waste (OIW) and Hazardous Industrial Waste (HIW) fell 17 % in 2006. Fundamental actions have been taken to : deployment of sustainable packaging, optimisation of waste sorting at source, behavioural changes in the plant's 6,000 workers....
 
7.ACI Le Mans
 The tonnage of the different waste families fell between 2000 and 2005. a 20 % cut in tonnage of inert waste from foundry sand thanks to improved management (other inert waste is correlated to the number of worksites conducted every year) ; a 15 % cut in tonnage of non-metallic ordinary industrial waste (OIW) (other OIW is correlated to variations in production) ; a 40 % cut in tonnage of hazardous industrial waste (HIW) : through the system of total management of industrial fluids (GTFI)....
 
8.Valladolid Body Assembly (Spain)
 The site has put in place several initiatives to reduce the volume of waste generated by each activity : waste separation and identification ; minimization of hazardous waste (press filters and centrifuging) ; phasing-out of PCB transformers ; use of durable packaging ; separate collection of cardboard / plastic and non-hazardous waste ; reduced wetness of paint sludge ; replacement of fluorescent tubes by others with longer lives ; reuse of waste, particularly pallets....
 
9.Improve waste management
 Reduce ordinary industrial waste (excluding metal offcuts) to 37 kg per vehicle by 2007.Reduce hazardous waste requiring treatment and disposal to 26 kg per vehicle by 2007.. End-of-life.
 
10.Improve waste management
 To cut quantities of hazardous waste produced by the paint shop, Renault has set up working groups to encourage the re-use of products in processes or with suppliers....