Industrial waste
Industrial waste

Our main pages on this subject:

1.Tandil
 The 8 % rise in the volume of industrial waste generated in 2007 was due to the increase in activity at the site : production of new models of cores previously subcontracted to an outside provider was brought in-house, and a new electric furnace was installed.... Optimizing core production processes to reduce (gas-fired) heat treatment of industrial waste ,...
 
2.Vilvoorde - RIB
 Ordinary Industrial Waste (OIW) and Hazardous Industrial Waste (HIW) tonnage dropped 59 % and 92 % respectively between 2001 and 2007. The plant recovers 100 % of its waste....
 
3.Renault do Brazil Ayrton Senna Complex
 Ordinary industrial waste (OIW) and hazardous industrial waste (HIW) tonnage rose....
 
4.Los Andes - CORMECANICA
 Treating all effluents before sending them directly to the municipal system.Since 2003, the plant introduced the " zero industrial waste " approach.. A treatment plant for aqueous waste was opened at the beginning of 2005, which is reducing the quantity of polluting liquid residues sent for outside treatment..
 
5.Choisy-le-Roi
 Ordinary industrial waste (OIW), made up primarily of metal waste, is recovered in full.... The decrease in 2007 can be attributed to the discontinuation of assembly of outside orders of gearboxes in mid-2006. Hazardous industrial waste (HIW) is generated mainly by washing of mechanical parts for reconditioning....
 
6.Douai
 Tonnages of Ordinary Industrial Waste (OIW) and Hazardous Industrial Waste (HIW) fell 17 % in 2006. Fundamental actions have been taken to : deployment of sustainable packaging, optimisation of waste sorting at source, behavioural changes in the plant's 6,000 workers....
 
7.Flins
 Tonnages of Ordinary Industrial Waste (OIW) increased significantly in 1999. This increase can be attributed to growth in the spare parts business on the site (increase in packaging waste) and to growth in industrial activity in that year generating a proportional increase in metal waste.... A 35 % reduction in Hazardous Industrial Waste (HIW) was achieved between 1998 and 2003....
 
8.ACI Le Mans
 The tonnage of the different waste families fell between 2000 and 2005. a 20 % cut in tonnage of inert waste from foundry sand thanks to improved management (other inert waste is correlated to the number of worksites conducted every year) ; a 15 % cut in tonnage of non-metallic ordinary industrial waste (OIW) (other OIW is correlated to variations in production) ; a 40 % cut in tonnage of hazardous industrial waste (HIW) : through the system of total management of industrial fluids (GTFI)....
 
9.Palencia (Spain)
 The treatment of cooking oils as reusable waste and the installation of oil separators in loading and unloading areas reduced the oils to be processed in the plant's industrial waste.... A 9 % reduction in the number of kg per vehicle of Hazardous Industrial Waste (HIW) was achieved in 2007....
 
10.Improve waste management
 Reduce ordinary industrial waste (excluding metal offcuts) to 37 kg per vehicle by 2007....