1.Foundry Aluminium Cordoba (Argentina)
 Water consumption... Water consumption figures between 2000 and 2002 are estimates.... In late 2002, the site introduced water consumption meters by sector, making it possible to measure both site and sector consumption for the first time.... The installation and start-up of automatic coating of some pressure-injection machines at the beginning of 2004 increased productivity, but also water consumption....
 
2.Vilvoorde - RIB
 Water consumption... Water consumption for the whole site is measured by a general meter.... RIB's lower environmental impact, particularly as concerns the lower water and energy consumption, is the result of staff commitment to more efficient use of facilities and buildings....
 
3.Los Andes - CORMECANICA
 Water consumption... The increase in the site's water consumption is directly linked to the sharp 75 % increase in production in 2007.... The increase in the site's water consumption is directly linked to the sharp 75 % increase in production in 2007....
 
4.Dieppe - ALPINE
 Water consumption... Water consumption per vehicle manufactured was reduced from 1.1 m3 in 1999 to 0.57 m3 in 2007. The volume of drinking water in 2007 was 28 % lower than in 2005.... In the space of ten years, the plant has reduced its water consumption by 70 %....
 
5.Heudebouville Somac
 Water consumption... Water consumption was reduced by 57 % in 2007 after numerous leaks were repaired....
 
6.Lardy - Centre technique
 Water consumption... In 2007, water consumption at the Lardy technical centre continued to fall, as in recent years.... Completed at the end of 2006, the switch to closed-loop cooling systems paid off fully in 2007, by reducing water consumption by a further 4 %.... Since the results for water consumption were so positive, targets were redefined in 2007. The removal of the last open-loop cooling towers was the final improvement in this area....
 
7.Rueil (CTR)
 Water consumption... The modernisation carried out on the site has led to changes that considerably reduce mains water consumption.... Maintenance difficulties in 2004 and 2005 pushed up water consumption.... In 2006 and 2007, lower water consumption levels were once again observed....
 
8.Pitesti - ACI
 Water consumption... The site has closed-loop cooling towers, to limit water consumption.... Water consumption increased by 26 % in 2007. This increase should be compared with the 40 % increase in the workforce and the 66 % increase in production.... On a like-for-like basis, water consumption decreased....
 
9.Protect water resources
 Based on 3 criteria, Renault eco² is awarded in particular to vehicles in the range manufactured on an industrial site that respects the ISO 14001 standard.This certification validates the procedures launched on the site to reduce water consumption and fluid waste.. Production phase. Targets were reached for water consumption :.
 
10.Protect water resources
 By 2007, halve water consumption by vehicle compared with 1998....